Burlington Skyway bridge repair 2018
Removing steel/concrete panel to start work on the expansion joint. Protected from traffic by the mobile barrier (big orange thing)
![]() |
Piece of expansion joint that was cut out and brought under the bridge by float trailer. |
![]() |
View from the hanging work platform underneath the skyway, looking towards the CN Tower |
Comments
Post a Comment