Burlington Skyway bridge repair 2018
Removing steel/concrete panel to start work on the expansion joint. Protected from traffic by the mobile barrier (big orange thing) Piece of expansion joint that was cut out and brought under the bridge by float trailer. View from the hanging work platform underneath the skyway, looking towards the CN Tower